A load bank test proves an installation under real load, but the setup around it is a trade in its own right. On behalf of UPS manufacturers and their channel, we position the load bank, connect it, arrange cooling and air exhaust, and remove everything afterward. You or the manufacturer run the test.

Role
Setup · Connection · Removal
Focus
Cooling and safe placement
Coverage
Netherlands & EMEA
The test
Stays with you or the manufacturer
FEED5× 200 kW · 1 MW1 REMOTECABLE SETS ≤75 m · UNITS <600 kgFIRST CASEFC-LBA-01LOADBANK ASSIST01 · SETUPSCHAALISO

Load banks positioned: safely, and in the right spot.

A load bank is a portable dummy load: it absorbs the installation's power and turns it into heat. A unit like that is heavy, runs hot and needs air exhaust. We pick the spot, check the floor loading and place the units safely, even in a tight or active hall. In one data hall we set up five compact 200 kW units, each under the 600 kg floor limit.

01Spot and floor loading determined up front
02Compact units for tight rooms
03Safe placement in an active environment

The connection to your feed, with as little cable as possible.

We run the cable sets from the feed to the load bank and connect both ends. In that same data hall, the five units combined delivered 1 MW per feed, connected with cable sets up to 75 m and linked to a single remote control. We route the hot air out, so the hall's cooling does not have to carry the test.

01Cable sets up to 75 m
021 MW per feed, units combined
03Cooling and air exhaust arranged before the start
1 MWSTEPPED LOADREMOTEBOTH FEEDS · 1 MW PER FEEDFIRST CASEFC-LBA-02LOADBANK ASSIST02 · CONNECTIONSCHAALISO
SITE · AMSTERDAM CSSUPPLY ROUTELOGISTICS & SUPPLY10× PALLET10 PALLETS · INBOUND & OUTBOUNDFIRST CASEFC-LBA-03LOADBANK ASSIST03 · TEARDOWNSCHAALISO

You run the test. We handle the setup.

You or the manufacturer write the test program and run the test. Our engineers stay with the setup, switch it over when the next feed is due and adjust whatever the program asks for. Once the test is done, we remove the units and cabling. In the data hall, that was after five days, and the hall was handed back clean.

01Program and assessment: you or the manufacturer
02We switch over, feed by feed
03Units and cabling removed, hall clean

The complete work package

Setup

Units safely in place. Transport into the hall, spot chosen for floor loading and access. Compact units where space is tight.

Connection

Cable sets to the feed. We run the sets and connect the load bank, with as little cable in the hall as possible. Sets up to 75 m to reach the setup.

Cooling & exhaust

A load bank turns the full power into heat. We arrange the air exhaust, so the test does not burden the hall's cooling.

Switch-over

Testing multiple feeds? We switch the setup over, one side at a time, so each feed can be loaded separately.

Assistance

During the test our engineers stay with the setup for adjustments. You or the manufacturer run the test.

Removal

After the test we remove the units and cabling and hand the hall back clean, ready for production.

Setup
Units safely in place
+

Transport into the hall, spot chosen for floor loading and access. Compact units where space is tight.

Connection
Cable sets to the feed
+

We run the sets and connect the load bank, with as little cable in the hall as possible. Sets up to 75 m to reach the setup.

Cooling & exhaust
The heat out of the hall
+

A load bank turns the full power into heat. We arrange the air exhaust, so the test does not burden the hall's cooling.

Switch-over
Feed by feed
+

Testing multiple feeds? We switch the setup over, one side at a time, so each feed can be loaded separately.

Assistance
Engineers at the setup
+

During the test our engineers stay with the setup for adjustments. You or the manufacturer run the test.

Removal
Everything out, hall clean
+

After the test we remove the units and cabling and hand the hall back clean, ready for production.

How we handle the setup

Four steps, from survey to clean handover.

Request a quote
01

Survey & plan

Together with you or the manufacturer we determine the spot, the route in, the connection and the air exhaust.

02

Set up & connect

Units in place, cable sets run and connected, cooling and exhaust arranged.

03

During the test

You or the manufacturer run the program. We switch over and adjust the setup.

04

Teardown & handover

Units and cabling removed, hall handed back clean, ready for production.

Related cases

View all cases
On request

Test day planned, setup not yet?

Call us or request a quote. We position the load bank, connect it and remove everything afterward.

Request a quote
+31 (0)174 221 161
//more services

More from First Case

//Contact

Leave your details and we'll call you back.

One address, from transport to handover. A response within 24 hours.

Response timeWithin 24 hours
Prefer to call?+31 (0)174 221 161