First Case installs busbar, power cabling and cable trays in data centres, with its own engineers and every run measured. We install busbar and busway in live data halls too. We work for UPS manufacturers and their channel, and as a subcontractor for the work installers outsource to us.
Busbars are the copper or aluminium rails that carry heavy power through the data hall. We mount main and distribution busbar on a fixed support structure, aligned and fixed joint by joint. In the Netherlands: around 680 m in 52 runs, mounted in a live data hall.
We pull power cabling over cable trays and ladders, the support systems we mount ourselves, and terminate it at the distribution. Lugs are crimped properly; every conductor gets a label on both ends. One project: 144 DC cables of 95 mm², terminated with M10 lugs.
After installation we check every run and every cable with an insulation tester, the measurement that confirms the insulation is healthy. The readings go into the handover file. In the Netherlands, the Site Acceptance Test, the client's acceptance test, confirmed the installation run by run.
Installation of main and distribution busbar on a fixed support structure. Aligned, fixed joint by joint, in live halls within fixed work windows.
Pulling and terminating power cabling. With the right lugs, properly crimped, and every conductor labelled on both ends.
Installation of cable trays and ladders, the support system the cabling runs on. Aligned and supported, ready for the pulling crew.
Standard electrical work we do ourselves, up to and including the connection to the distribution. Connecting transformers is specialist work: we deliver it within the project, execution runs through a specialised partner.
Insulation test per run and per cable, every conductor labelled on both ends. The readings go into the handover file.
On a fixed support structure, aligned and fixed joint by joint. In live halls too, within fixed work windows.
With the right lugs, properly crimped, and every conductor labelled on both ends.
The support system the cabling runs on. Aligned and supported, ready for the pulling crew.
Standard electrical work we do ourselves. Connecting transformers is specialist work: we deliver it within the project, execution runs through a specialised partner.
Measured per run and per cable, every conductor labelled on both ends. The readings go into the handover file.
Four steps, from survey to documented handover.
We walk the hall, set out the route and agree on the work windows.
Whatever can be done in advance happens in our warehouse. It keeps time on the floor short.
Trays, busbar and cabling, mounted by our own engineers within the agreed windows.
Insulation test per run, every conductor labelled, readings in the handover file.
Planned electrical work on the entire electrical installation of a hyperscale data centre in the Netherlands with a fixed supervisor-led crew, more than 200 planned working days over several months.
Around 680 m of busbar installed in a colocation data centre in the Netherlands, including support structure, insulation testing and handover via Site Acceptance Test.
Call us or request a quote. We also work as a subcontractor: the pulling and mounting work you outsource to us.
We position and install, every brand. Testing and maintenance stay with the manufacturer.
Read more →BAChange-out, monitoring and testing on assignment, both lead and lithium.
Read more →CTCold and hot aisles separated, to our own design.
Read more →TRWhat we bring in, we also put in place. No handoff.
Read more →WHWe receive, store and deliver to site when it suits the schedule.
Read more →One address, from transport to handover. A response within 24 hours.
That choice lies in the design of the installation. Busbars are copper or aluminium rails that carry heavy power through the data hall; power cables run over cable trays and ladders to the distribution. We install both, with our own engineers, and measure every run afterwards.
Yes. We mount main and distribution busbar on a fixed support structure, aligned and fixed joint by joint, within fixed work windows. In the Netherlands we installed around 680 m of busbar in 52 runs in a live data hall this way. The Site Acceptance Test, the client's acceptance test, confirmed the installation run by run.
After installation we check every run and every cable with an insulation tester, the measurement that confirms the insulation is healthy. Every conductor is labelled on both ends. The readings go into the handover file.
Yes. We work for UPS manufacturers and their channel, and as a subcontractor for the work installers outsource to us. Our own engineers carry out the pulling and installation work, within the agreed windows.
Cable trays and ladders: the support system the cabling rests on. We install them aligned and supported, ready for the pulling crew. We then pull the power cabling over them and terminate it with the right lugs, properly crimped. One project involved 144 DC cables of 95 mm², terminated with M10 lugs.
Standard electrical work we do ourselves, up to and including the connection to the distribution. Busbars, power cabling and cable trays and ladders we install with our own engineers. Connecting transformers is specialist work: we deliver it within the project, and a specialist partner carries it out.