Data centre projects across Europe

A selection of the work: cabling, UPS installations, battery replacements and measurements in data centres from the Netherlands to Turkey.

//Our work
Data centre projects across Europe

A selection of the work: cabling, UPS, batteries and measurements in data centres from the Netherlands to Turkey.

MONITORING6× STRINGS · 30 BLOCSREPLACEMENT & MONITORING11.600+ BLOCKS · PER-BLOCK MONITORINGFIRST CASEFC-2603-02BATTERY REPLACEMENT02 · REPLACEMENTSCALEISO
FeaturedBattery Replacement · 2026 · Germany

11.600+ batteries replaced across 50+ UPS systems, Germany

First Case replaces 11.600+ batteries across 50+ UPS systems at a data centre in Germany, from large 1.140 kW units to smaller systems. The work is done per system and string, so the remaining capacity stays available. Each block is connected to continuous per-block monitoring, with a final verification per battery before release.

11.600+
Batteries replaced
50+
UPS systems
100%
Monitored per block
Read the case →
MONITORING6× STRINGS · 30 BLOCSREPLACEMENT & MONITORING11.600+ BLOCKS · PER-BLOCK MONITORINGFIRST CASEFC-2603-02BATTERY REPLACEMENT02 · REPLACEMENTSCALEISO
FeaturedBattery Replacement · 2026 · Germany
11.600+ batteries replaced across 50+ UPS systems, Germany

First Case replaces 11.600+ batteries across 50+ UPS systems at a data centre in Germany, from large 1.140 kW units to smaller systems. The work is done per system and string, so the remaining capacity stays available. Each block is connected to continuous per-block monitoring, with a final verification per battery before release.

11.600+
Batteries replaced
50+
UPS systems
100%
Monitored per block
Read the case →
DEDICATED E-CREW6× PANEL · ELECTRICALSUPERVISOR-LED CREW · IN OPERATIONFIRST CASEFC-2601-02E-TEAM02 · EXECUTIONSCALEISO
Netherlands

A dedicated electrical crew for a data centre's installation

Planned electrical work on the entire electrical installation of a hyperscale data centre in the Netherlands with a fixed supervisor-led crew, more than 200 planned working days over several months.

E-team2026
M10DC CABLING144 CABLES · 95 mm² · M10 CRIMPEDFIRST CASEFC-2502-02UPS & DC CABLING02 · DC CABLINGSCALEISO
Netherlands

12 UPS systems placed and fully DC-cabled

12 UPS systems placed and fully DC-cabled in a colocation data centre in the Netherlands, 144 cables of 95 mm², every conductor labelled.

Installation2025
FEED5× 200 kW · 1 MW1 REMOTECABLE SETS ≤75 m · UNITS <600 kgFIRST CASEFC-2305-01LOADBANK ASSIST01 · SETUPSCALEISO
Netherlands

New busbar tested with a 1 MW loadbank

A 1 MW loadbank positioned and connected to a new busbar system: both feeds loaded separately and in steps, five units under a single remote control.

Loadbank Assist2023
MAIN + DISTRIBUTION BUSBAR~680 mALIGNED · JOINT BY JOINTFIRST CASEFC-2304-02BUSBAR INSTALLATION02 · INSTALLATIONSCALEISO
Netherlands

680 m of busbar installed in a Dutch data centre

Around 680 m of busbar installed in a colocation data centre in the Netherlands, including support structure, insulation testing and handover via Site Acceptance Test.

Installation2023
COMPUTER FLOOR · ESD-HEPAFLOOR TILES BOTH SIDES · MAX. 5 AT A TIMEFIRST CASEFC-2503-02DEEP CLEANING02 · DEEP CLEANSCALEISO
Netherlands

Multiple data centres cleaned dust-free, three times yearly

Three times a year ESD- and HEPA-certified deep clean of computer floors, 1.200+ racks and cable trays across multiple data centres of a hyperscaler in the Netherlands.

Deep Cleaning2025
DRIVE · 140 mmMAGNETIC LOCKPUSH BUTTON1.200 mmCONTAINMENT DOOR1.200 mm AISLE · BI-PARTING · ELECTRIC · MAGNETIC LOCKFIRST CASEFC-2602-01CONTAINMENT TURKEY01 · ENGINEERINGSCALEISO
Turkey

62 automated containment doors supplied to Turkey

62 automated containment sliding doors to our own design, electric with magnetic lock, supplied export-ready for a data centre in Turkey.

Containment2026
TEMP SENSORNETWORK CARDBYPASS PANELBREAKERBREAKERBREAKERINSTALL-READYFINISHING & HANDOVERBYPASS · SENSORS · INSTALL-READYFIRST CASEFC-2301-03UPS INSTALLATION03 · FINISHINGSCALEISO
Amsterdam Centraal

UPS installation placed at Amsterdam Centraal station

Transport, placement and mechanical installation of two 200 kVA UPS systems with 92 battery blocks at Amsterdam Centraal station, handed over install-ready.

Installation2023
CONNECTORS OUT8× STRINGS · 38 BLOCS3× SYSTEM912 BLOCKS OUTFIRST CASEFC-2501-01BATTERY REPLACEMENT01 · DISASSEMBLYSCALEISO
Netherlands

912 batteries replaced across three UPS systems

912 batteries replaced across three 1.500 kVA UPS systems, old blocks sent for certified disposal through our recycling partner.

Battery Replacement2025
LIMIT VALUE / TYPEMULTIPLE DATA CENTRES36.000+ BATTERIESFIRST CASEFC-2601-01BATTERY MEASUREMENT01 · INVENTORYSCALEISO
Netherlands

36.000+ batteries measured yearly, estate-wide

Condition of 36.000+ batteries across multiple data centres, measured yearly with report and forecast.

Battery Measurement2026
DEDICATED E-CREW6× PANEL · ELECTRICALSUPERVISOR-LED CREW · IN OPERATIONFIRST CASEFC-2601-02E-TEAM02 · EXECUTIONSCALEISO
Netherlands
A dedicated electrical crew for a data centre's installation
2026
M10DC CABLING144 CABLES · 95 mm² · M10 CRIMPEDFIRST CASEFC-2502-02UPS & DC CABLING02 · DC CABLINGSCALEISO
Netherlands
12 UPS systems placed and fully DC-cabled
2025
FEED5× 200 kW · 1 MW1 REMOTECABLE SETS ≤75 m · UNITS <600 kgFIRST CASEFC-2305-01LOADBANK ASSIST01 · SETUPSCALEISO
Netherlands
New busbar tested with a 1 MW loadbank
2023
MAIN + DISTRIBUTION BUSBAR~680 mALIGNED · JOINT BY JOINTFIRST CASEFC-2304-02BUSBAR INSTALLATION02 · INSTALLATIONSCALEISO
Netherlands
680 m of busbar installed in a Dutch data centre
2023
COMPUTER FLOOR · ESD-HEPAFLOOR TILES BOTH SIDES · MAX. 5 AT A TIMEFIRST CASEFC-2503-02DEEP CLEANING02 · DEEP CLEANSCALEISO
Netherlands
Multiple data centres cleaned dust-free, three times yearly
2025
DRIVE · 140 mmMAGNETIC LOCKPUSH BUTTON1.200 mmCONTAINMENT DOOR1.200 mm AISLE · BI-PARTING · ELECTRIC · MAGNETIC LOCKFIRST CASEFC-2602-01CONTAINMENT TURKEY01 · ENGINEERINGSCALEISO
Turkey
62 automated containment doors supplied to Turkey
2026
TEMP SENSORNETWORK CARDBYPASS PANELBREAKERBREAKERBREAKERINSTALL-READYFINISHING & HANDOVERBYPASS · SENSORS · INSTALL-READYFIRST CASEFC-2301-03UPS INSTALLATION03 · FINISHINGSCALEISO
Amsterdam Centraal
UPS installation placed at Amsterdam Centraal station
2023
CONNECTORS OUT8× STRINGS · 38 BLOCS3× SYSTEM912 BLOCKS OUTFIRST CASEFC-2501-01BATTERY REPLACEMENT01 · DISASSEMBLYSCALEISO
Netherlands
912 batteries replaced across three UPS systems
2025
LIMIT VALUE / TYPEMULTIPLE DATA CENTRES36.000+ BATTERIESFIRST CASEFC-2601-01BATTERY MEASUREMENT01 · INVENTORYSCALEISO
Netherlands
36.000+ batteries measured yearly, estate-wide
2026
//Contact

Your project, our next case?

From a single UPS to a complete data center. Call us or request a quote and we'll take a look on site.