First Case
//core service

UPS installation

We place and install UPS systems in data centers, every brand, working for UPS manufacturers and their channel. Testing, maintenance, and commissioning stay with the manufacturer.

Scope
Placement · Installation · Replacement · Decommissioning
Brand policy
Every brand, every chemistry
Coverage
Netherlands & EMEA, on site
Handover
Install-ready
FEEDTHROUGHS12 UPS-SYSTEMSPLACED · FEEDTHROUGHS PREPAREDFIRST CASEFC-UPS-01UPS INSTALLATION01 · INSTALLATIONSCHAALISO

From the dock to the connection: we put the system in.

A greenfield build, a new room with no existing installation, or a 1-to-1 replacement of an end-of-life system: we plan the work around the site's uptime, not the other way around. Placement, cabling, and connection, carried out by our own engineers.

01Greenfield installation and expansion
021-to-1 replacement of end-of-life systems
03Temporary bypass & redundant transfer

The new system in. The old one out. No downtime.

For a replacement we set up a temporary bypass: a power path that keeps the load protected while the old system comes out and the new one goes in. The load is never left unprotected. The phasing is worked out in advance, system by system, step by step.

01Live swap with temporary bypass
02Phasing worked out in advance during work preparation
03Old system removed for certified disposal
SITE · AMSTERDAM CSSUPPLY ROUTELOGISTICS & SUPPLY10× PALLET10 PALLETS · INBOUND & OUTBOUNDFIRST CASEFC-UPS-02UPS INSTALLATION02 · DELIVERYSCHAALISO
INSPECTION & LMRADATA HALL · INSTRUCTIONINSTRUCTION · BASELINE CHECK · LMRAFIRST CASEFC-UPS-03UPS INSTALLATION03 · INSPECTIONSCHAALISO

We place and install, install-ready.

Install-ready is our end point: the system is in position, cabled, and connected, ready for commissioning by the manufacturer or the system builder. Commissioning, bringing the system into service and testing it, stays with the manufacturer. Batteries we cover in full: from change-out, replacing complete battery strings, to monitoring and testing.

01Handed over install-ready to the manufacturer or system builder
02Commissioning and testing: the manufacturer's domain
03Full battery scope, see the Batteries page

The work package

Transport

White glove treatment: what we bring, we place ourselves. Our own trucks, internal transportation into the server room, and placement in position. The same crew that drives it sets it down: no handover, no unnecessary noise.

Installation

From mechanical placement to the complete electrical connection: cabling and tie-in to the backup power supply. Then we hand over install-ready.

Replacement

Live swap with temporary bypass, so the load is never left unprotected. The old system is removed for certified disposal.

Decommissioning

Safe dismantling of systems going out of service. Batteries are removed in line with the rules, including lithium under ADR, the European regulations for transporting hazardous goods by road, with certified recycling through our recycling partner.

Transport
Own trucks, white glove treatment
+

White glove treatment: what we bring, we place ourselves. Our own trucks, internal transportation into the server room, and placement in position. The same crew that drives it sets it down: no handover, no unnecessary noise.

Installation
Placement, cabling, and connection
+

From mechanical placement to the complete electrical connection: cabling and tie-in to the backup power supply. Then we hand over install-ready.

Replacement
Old system out, new system in
+

Live swap with temporary bypass, so the load is never left unprotected. The old system is removed for certified disposal.

Decommissioning
Dismantling, removal, and recycling
+

Safe dismantling of systems going out of service. Batteries are removed in line with the rules, including lithium under ADR, the European regulations for transporting hazardous goods by road, with certified recycling through our recycling partner.

How we run a UPS installation

Four steps, from survey to handover. Our own engineers, your uptime as the starting point.

Request a quote
01

Site survey

We visit the site and survey the route, the room, and the connection. Every brand, every configuration.

02

Work preparation & planning

Work preparation plans every hour around your uptime. Bypass, phasing, logistics: fixed in advance.

03

Execution on site

Our own engineers do the work: certified to VCA and NEN 3140, the Dutch standard for safe work on electrical installations, with a fixed ESD protocol against static discharge.

04

Install-ready handover

Placed, cabled, and connected: handed over install-ready for commissioning by the manufacturer or the system builder.

Related cases

View all cases
Every brand

A UPS to place or replace?

Call us or request a quote. We survey the site, plan around your uptime, and hand over install-ready.

Request a quote
+31 (0)174 221 161
//more services

More from First Case

//Contact

Leave your details and we'll call you back.

One address, from transport to handover. A response within 24 hours.

Response timeWithin 24 hours
Prefer to call?+31 (0)174 221 161