UPS & Battery Systems

The UPS does more than catch outages: it conditions the power continuously so a data center runs smoothly all day, and is also the last line of defense when the grid fails. We install, replace, test and decommission complete UPS and battery systems, from first delivery to the fail-over that never needs to act.

Scope
Installation · Replacement · Commissioning · Decommissioning
Brands
Schneider · Eaton, certified partner
Coverage
Netherlands & EMEA, on site
Response
Maintenance & monitoring
FEEDTHROUGHS12 UPS-SYSTEMSPLACED · FEEDTHROUGHS PREPARED
//Installation

The new system in. The old one out. Without downtime.

Whether it's a first installation or replacing an outdated system: we plan the work around your uptime, not the other way round. Live swaps, temporary bypass, phased migration, we've done it before.

01Greenfield installation and expansion
021-to-1 replacement of end-of-life systems
03Temporary bypass & redundant transfer
//Batteries

The battery must fail before your data center does.

Batteries are the weakest link in the chain and the first thing to age. We replace battery blocs without taking the system down, run capacity and impedance measurements and monitor 24/7, so a weak cell stands out before it fails.

01Replacement of VRLA & Li-ion blocs
02Capacity, impedance and thermal measurements
0324/7 battery monitoring with alerting
VALUES OKFINAL VERIFICATIONVERIFIED PER BATTERY · 100% PER BLOCK
LOAD-BANK TEST
//Commissioning

Only when the system is proven under full load is it finished.

A UPS that has never been truly loaded remains an assumption. With loadbank tests we put the system under controlled full load, verify the runtime and record everything in a handover file the auditor accepts.

01Full-load loadbank test at handover
02Verification of runtime and transfer times
03Handover file & periodic retest
//work package

The complete work package

Transport

A UPS system quickly weighs hundreds of kilos to several tonnes. We handle the specialised transport, the hoisting and rigging logistics and the safe move-in right into the server room.

Installation

From mechanical placement to the complete electrical connection: we handle the cabling, the tie-in to the backup power supply and the first power-up test.

Replacement

Live swap with temporary bypass, so the load is never left unprotected. The old system is removed and certified for disposal.

Battery work

Capacity, impedance and thermal measurements record the condition of every cell. We replace weak blocs before they endanger the runtime.

Commissioning

Under controlled full load we prove runtime and transfer times. Everything recorded in a file the auditor accepts.

Decommissioning

Safe dismantling, battery removal in line with regulations and certified recycling through our recycling partner.

Maintenance

Preventively planned, correctively delivered, with maintenance contracts and SLAs.

Transport
UPS cabinets and battery blocs
+

A UPS system quickly weighs hundreds of kilos to several tonnes. We handle the specialised transport, the hoisting and rigging logistics and the safe move-in right into the server room.

Installation
Placement, cabling and connection
+

From mechanical placement to the complete electrical connection: cabling, tie-in to the backup power supply and the first power-up test.

Replacement
Phasing out the old, commissioning the new
+

Live swap with temporary bypass, so the load is never left unprotected. The old system is removed and certified for disposal.

Battery work
Bloc replacement, measurements and monitoring
+

Capacity, impedance and thermal measurements record the condition of every cell. We replace weak blocs before they endanger the runtime.

Commissioning
Loadbank test and handover file
+

Under controlled full load we prove runtime and transfer times. Everything recorded in a file the auditor accepts.

Decommissioning
Dismantling, removal and recycling
+

Safe dismantling, battery removal in line with regulations and certified recycling through our recycling partner.

Maintenance
Preventive, corrective and SLAs
+

Preventively planned, correctively delivered, with maintenance contracts and SLAs.

//Our approach

How we run a UPS project

Four steps, from first survey to SLA. One team, our own engineers, your uptime as the starting point.

Request a quote
01

Survey & advice

We visit your site, assess the situation and, based on our certifications with every manufacturer, advise which system fits best.

02

Engineering & planning

Work preparation plans every hour around your uptime. Bypass, phasing, logistics, fixed in advance.

03

Execution on site

Our own engineers do the work. LOTO, ESD, no subcontractors in your critical space.

04

Commissioning & handover

Loadbank test, handover file and then the SLA. We stay involved.

//cases

Related cases

View all cases
Maintenance & monitoring

A UPS that cannot fail?

Call us or request a quote. We visit your site, take a look and advise you across all the brands we carry.

Request a quote
+31 (0)174 221 161
//more services

More from First Case

//Want to talk it through?

Leave your details and we'll call you back.

A response within 24 hours.

Response timeWithin 24 hours
Prefer to call?+31 (0)174 221 161