The UPS does more than catch outages: it conditions the power continuously so a data center runs smoothly all day, and is also the last line of defense when the grid fails. We install, replace, test and decommission complete UPS and battery systems, from first delivery to the fail-over that never needs to act.
Whether it's a first installation or replacing an outdated system: we plan the work around your uptime, not the other way round. Live swaps, temporary bypass, phased migration, we've done it before.
Batteries are the weakest link in the chain and the first thing to age. We replace battery blocs without taking the system down, run capacity and impedance measurements and monitor 24/7, so a weak cell stands out before it fails.
A UPS that has never been truly loaded remains an assumption. With loadbank tests we put the system under controlled full load, verify the runtime and record everything in a handover file the auditor accepts.
A UPS system quickly weighs hundreds of kilos to several tonnes. We handle the specialised transport, the hoisting and rigging logistics and the safe move-in right into the server room.
From mechanical placement to the complete electrical connection: we handle the cabling, the tie-in to the backup power supply and the first power-up test.
Live swap with temporary bypass, so the load is never left unprotected. The old system is removed and certified for disposal.
Capacity, impedance and thermal measurements record the condition of every cell. We replace weak blocs before they endanger the runtime.
Under controlled full load we prove runtime and transfer times. Everything recorded in a file the auditor accepts.
Safe dismantling, battery removal in line with regulations and certified recycling through our recycling partner.
Preventively planned, correctively delivered, with maintenance contracts and SLAs.
A UPS system quickly weighs hundreds of kilos to several tonnes. We handle the specialised transport, the hoisting and rigging logistics and the safe move-in right into the server room.
From mechanical placement to the complete electrical connection: cabling, tie-in to the backup power supply and the first power-up test.
Live swap with temporary bypass, so the load is never left unprotected. The old system is removed and certified for disposal.
Capacity, impedance and thermal measurements record the condition of every cell. We replace weak blocs before they endanger the runtime.
Under controlled full load we prove runtime and transfer times. Everything recorded in a file the auditor accepts.
Safe dismantling, battery removal in line with regulations and certified recycling through our recycling partner.
Preventively planned, correctively delivered, with maintenance contracts and SLAs.
Four steps, from first survey to SLA. One team, our own engineers, your uptime as the starting point.
We visit your site, assess the situation and, based on our certifications with every manufacturer, advise which system fits best.
Work preparation plans every hour around your uptime. Bypass, phasing, logistics, fixed in advance.
Our own engineers do the work. LOTO, ESD, no subcontractors in your critical space.
Loadbank test, handover file and then the SLA. We stay involved.
12 Schneider Galaxy VXL UPS systems placed and fully DC-cabled in a colocation data center in the Amsterdam region, 144 cables of 95 mm², every conductor labeled.
11.600+ batteries replaced across 50+ UPS systems at a data center in Frankfurt, each block connected to continuous monitoring.
Transport, placement and mechanical installation of two 200 kVA Schneider UPS systems with 92 battery blocks at Amsterdam Centraal station, handed over install-ready.
912 batteries replaced across three Galaxy VX 1.500 kVA UPS systems, old blocks recycled under certificate.
Call us or request a quote. We visit your site, take a look and advise you across all the brands we carry.
24/7 monitoring of batteries and systems; weak cells caught before failure.
Read more →MAPreventive and corrective maintenance for your critical power.
Read more →LBCommissioning and load testing to full capacity, with a handover file.
Read more →DCESD-safe cleaning of UPS and battery rooms while everything keeps running.
Read more →CTCold- and hot-aisle separation for sealed, efficient cooling.
Read more →A response within 24 hours.